Sunday, December 17, 2017
Erection of manufactured homes requires a permit that can be obtained from the City of Vicksburg Building and Inspection Department. The following conditions must normally be met to obtain a manufactured home permit:

The proposed site must be zoned as a Manufactured Home District.

Minimum lot size and other zoning requirements must be followed.

A complete set of plans must be approved by the Zoning Administrator and Building & Inspection Department.

The applicant must present receipt of payment of City of Vicksburg Water and Sewer Tap fees.

Only one manufactured home will be permitted on an individual pad site.

All manufactured homes must be skirted.

Electrical permits must be obtained prior to location of a manufactured home.

For more information about these permits, please stop by the Building and Inspection Department located at 819 South Street, between 8:00 a.m. and 5:00 p.m. Monday through Friday, or call the department at (601) 634-4528.

Inspection Contact Info

con_tel Phone: 601-634-4528
con_fax Fax: 601-619-7885
emailButtonemail: inspection@vicksburg.org

Hours: 8:00 am to 5:00 pm M-F

con_addressPhysical Address:
City of Vicksburg
Inspection Department
819 South Street
Vicksburg, MS 39180

con_addressMailing Address:
City of Vicksburg
Inspection Depatrment
PO Box 150
Vicksburg, MS 39181